| Automatically create 'zipped' style backups with
the built in 'zip' facility, OR create 'compressed' (CCSi proprietary)
type backup suitable for data interchange between various versions
of Estimator.
These backups can be configured so that they occur every time
a project is closed, whether confirmation is required first or
not, and where to store the backups.
Preferences can be set at Project
or System level.
|